fbpx

Expenditure

Terraces

Ord. Action Product’s name Expenditure Surface’s size m2/mb Total expenditure Packing Packages quantity
1 Con­tact layer IZOHAN renobud R‑102 1.9 kg/​m2 25 kg
2 Down­ward layer IZOHAN renobud R‑103 1.9 kg/​m2/​mm 25 kg
3 ATTENTION: The down­ward on con­tact lay­er is to be con­struct­ed when the bal­cony does not have down­ward on it’s own.
4 Grout­ing under vapur barrier  IZOHAN DYSPERBIT 0.2 kg/​m2 10/​20 kg
5 Vapour bar­ri­er
6 Hydro-insu­la­tion
7 Tiles bond­ing IZOHAN RENOBUD C‑520 25 kg
8 Grout­ing IZOHAN RENOBUD C‑503 0.7 kg/​m2 5 kg
h