Ord. Action Product’s name Expenditure Surface’s size m2/mb Total expenditure Packing Packages quantity
1 Con­tact layer IZOHAN renobud R‑102 1.9 kg/​m2 25 kg
2 Down­ward layer IZOHAN renobud R‑103 1.9 kg/​m2/​mm 25 kg
3 ATTENTION: The down­ward on con­tact lay­er is to be con­struct­ed when the bal­cony does not have down­ward on it’s own.
4 2 mm water­proof­ing insulation 
5 Tiles bond­ing IZOHAN RENOBUD C‑520 25 kg
6 Grout­ing IZOHAN RENOBUD C‑503 0.7 kg/​m2 5 kg

Data publikacji: 9 September 2018

Ord. Action Product’s name Expenditure Surface’s size m2/mb Total expenditure Packing Packages quantity
1 Con­tact layer IZOHAN renobud R‑102 1.9 kg/​m2 25 kg
2 Down­ward layer IZOHAN renobud R‑103 1.9 kg/​m2 25 kg
3 ATTENTION: The down­ward on con­tact lay­er is to be con­struct­ed when the bal­cony does not have down­ward on it’s own.
4 Epoxy priming IZOHAN epoxy EP-601 0.4 kg/​m2 3/​6 kg
5 Epoxy mem­brane IZOHAN epoxy EP-602 1.6 kg/​m2 4/​6 kg
6 Epoxy sealant
7 Water­tight taping  IZOHAN SEALING TAPE 1.0 mb 10/​50 mb

Data publikacji: 9 September 2018

Ord. Action Product’s name Expenditure Surface’s size m2/mb Total expenditure Packing Packages quantity
1 Con­tact layer IZOHAN renobud R‑102 1.9 kg/​m2 25 kg
2 Down­ward layer IZOHAN renobud R‑103 1.9 kg/​m2/​mm 25 kg
3 ATTENTION: The down­ward on con­tact lay­er is to be con­struct­ed when the bal­cony does not have down­ward on it’s own.
4 Grout­ing under vapur barrier  IZOHAN DYSPERBIT 0.2 kg/​m2 10/​20 kg
5 Vapour bar­ri­er
6 Hydro-insu­la­tion
7 Tiles bond­ing IZOHAN RENOBUD C‑520 25 kg
8 Grout­ing IZOHAN RENOBUD C‑503 0.7 kg/​m2 5 kg

Data publikacji: 9 September 2018

Ord. Action Product’s name Expenditure Surface’s size m2/mb Total expenditure Packing Packages quantity
1 Min­er­al foun­da­tion priming
2 Prop­er damp-insu­la­tion — thin coat mass
3 Prop­er damp-insu­la­tion — - Thick-coat KMB mass
4 Poly­styrene bonding

Data publikacji: 9 September 2018

Ord. Action Product’s name Expenditure Surface’s size m2/mb Total expenditure Packing Packages quantity
1 Min­er­al foun­da­tion priming
2 Hydro-insu­la­tion (under water press.) /​ Thick-coat KMB mass
3 Poly­styrene bonding

Data publikacji: 9 September 2018

Ord. Action Product’s name Expenditure Surface’s size m2/mb Total expenditure Packing Packages quantity
1 Min­er­al foun­da­tion priming
2 Hydro-insu­la­tion (under water press.) /​ Thick-coat mass
3 Poly­styrene bonding

Data publikacji: 9 September 2018

Ord. Action Product’s name Expenditure Surface’s size m2/mb Total expenditure Packing Packages quantity
1 Min­er­al foun­da­tion prim­ing and prop­er insulation
2 Ther­mal insu­la­tion bonding IZOHAN EKOLEP 2.2 kg/​m2 10 kg

Data publikacji: 9 September 2018

Ord. Action Product’s name Expenditure Surface’s size m2/mb Total expenditure Packing Packages quantity
1 Min­er­al foun­da­tion priming
2 Insu­la­tion IZOHAN IMS 2.7 kg/​m2
(gr. 3 mm)
15 kg
3 Ther­mal insu­la­tion bonding IZOHAN EKOLEP 2.2 kg/​m2 10 kg

Data publikacji: 9 September 2018

Ord. Action Product’s name Expenditure Surface’s size m2/mb Total expenditure Packing Packages quantity
1 Min­er­al foun­da­tion priming
2 Iso­la­tion IZOHAN IMS 3.6 kg/​m2
(izo­lac­ja gr. 4 mm)
15 kg
3 Ther­mal insu­la­tion bonding IZOHAN EKOLEP 2.2 kg/​m2 10 kg

Data publikacji: 9 September 2018

Ord. Action Product’s name Expenditure Surface’s size m2/mb Total expenditure Packing Packages quantity
1 Con­tact coat IZOHAN renobud R‑102 1.9 kg/​m2 25 kg
2 Lev­el­ing layer IZOHAN renobud R‑105 1.8 kg/​m2 25 kg
3 Prim­ing IZOHAN GENERAL USE PRIMING SOLUTION 0.15 kg/​m2 1/​5 kg
4 Damp Proof­ing
5 Tiles bond­ing IZOHAN RENOBUD C‑520 25 kg
6 Grout­ing

* 3 mm wide grout; 10×10 [cm]

Data publikacji: 9 September 2018